|
No.
|
Project
Title
|
Owner
|
Client
|
Completion
Date
|
|
1.
|
Heat Exchanger,
E-1750A Cleaning Work To Perform Cleaning of Heat Exchanger E-1750A onboard FPSO Bunga Kertas
(BUK-WSR-PRD-015-09)
|
Petronas Carigali Sdn
Bhd
|
FPSO Ventures Sdn
Bhd
|
Dec
2009
|
|
2.
|
Dulang-Field
Compressed Gas Facility Enhancement (DL-B) Chemical Cleaning & Lube Oil Flushing
Works
|
|
Kencana HL Sdn
Bhd
|
Jan
2010
|
|
3.
|
Design and Supply of
Pressure Vessels Package For Cili Padi Gas Development Project - Skids - Chemical Cleaning
Job
|
|
Mset Engineering Corp
Sdn Bhd
|
Aug
2009
|
|
4.
|
Chemical Cleaning Work
at Pulai A Platform (Offshore) KSB Phase 1
|
|
Highbase Strategic Sdn
Bhd
|
June
2009
|
|
5.
|
Mechanical and Piping
Installation Works of Bintulu Onshore Receiving Facility (BORF) for SK309/311 Phase 1 Gas
Development Project, Provision of Chemical Cleaning of Additional PG & FG Piping
System
|
Murphy
Oil
|
Kencana Infrastructure
Sdn Bhd
|
Aug
2009
|
|
6.
|
EMAX Passivation Works
Chemical Cleaning, Wastewater Treatment - Supply Manpower, Equipment and Others
|
Ethylene Malaysia Sdn
Bhd
|
Toyo Engineering &
Construction Sdn Bhd
|
July
2009
|
|
7.
|
Provision of Supply
Manpower Supervision, Equipment, Tools, and Consumables for Acid Cleaning Works -
B11KA
|
|
Malaysia Marine and
Heavy Engineering Sdn Bhd
|
Aug
2009
|
|
8.
|
Chemical Cleaning
Services for GRVE Pipings for F23VLAP Compression Modules
|
Sime Darby Engineering
Sdn Bhd
|
Pacific Advance
Composites Sdn Bhd
|
Apr
2009
|
|
9.
|
Chemical Cleaning of
Unit 5 Boiler
|
Kapar Energy Ventures
Sdn Bhd
|
Kapar Energy Ventures
Sdn Bhd
|
July
2009
|
|
10.
|
Chemical Cleaning
Works for Kumang Skid Project PCSB (F9JT-A)
|
|
Mset Engineering Corp
Sdn Bhd
|
Apr
2009
|
|
11.
|
Chemical Cleaning of
FPSO Bunga Kertas: Hot Oil Piping Systems Inclusive of V-6500, E-1710 and
HX6510/6520
|
Petronas Carigali Sdn
Bhd
|
Highbase Strategic Sdn
Bhd
|
Apr
2009
|
|
12.
|
Chemical
Cleaning / Flushing of Ppe Work and Rental of Equipment
|
|
Pathfinder M & E
Sdn Bhd
|
Jan
2009
|